Construction and equipping of a new modern school for 264 seats in the territory of Sohil MCA, Pakhtaabad district, Andijan region, within the framework of the Rural Infrastructure Development Project.
The number of residents in Sohil MCA is 2631 people. Due to the lack of a secondary school in the territory of Sohil MCA, more than 410 school-age students living in this area attend secondary school No. 14 at a distance of 2.5-3.0 km. Name of subproject: Construction of a new modern school for 264 seats on the territory of Sohil MCA, Pakhtaabad district, Andijan region
Reconstruction and equipping of the branch of school No. 30 in Saroy MCA, Bakhmal district, Jizzakh region, within the Rural Infrastructure Development Project.
The number of residents in the territory of Saroy MCA is 2789 people. Name of the subproject: Reconstruction of the existing 220-seat school in accordance with the requirements of modern architecture in Saroy MCA, Bakhmal district, Jizzakh region. Current state of the school: Secondary school No. 30, located on the territory of Saray MCA, was built in 1976 for 240 students. Also, a branch of the school in the area was built in 1985, and later adapted to accommodate 120 students. Today, a total of 484 students (including 419 in the school and 65 in the school branch) study at this school and school branch.
Project implementation process
The process of implementation of the tertiary road repair subproject with a total length of 10.09 km in Madaniyat MCA in Bakhmal district of Jizzakh region.
The process of implementation of tertiary road repair subproject with a total length of 11,92 km in Oykor MCA in Bakhmal District of Jizzakh region.
The process of implementation of tertiary road repair subproject with a total length of 25,55 km in Beshkubi MCA of Zomin district in Jizzakh region.
The process of implementation of tertiary road repair subproject with a total length of 17,12 km in Gulshan MCA of Zomin district in Jizzakh region.
The process of implementation of tertiary road repair subproject with a total length of 12,83 km in Chorvador MCA of Zomin district in Jizzakh region.
The process of implementation of tertiary road repair subproject with a total length of 8,24 km in Turkman MCA of Zomin district in Jizzakh region.
The process of implementation of tertiary road repair subproject with a total length of 33,16 km in Narvon MCA of Forish district in Jizzakh region.